Add 2 pole-mounted communicable electronic reclosers and 1 pad-mounted communicable electronic switch to pre-existing poles and ground sleeve for t…
Reroute existing overhear distribution lines as identified to existing roadway ROW's with underground distribution lines.…
The Klickitat PUD will upgrade approximately 7.5 miles of old, outdated poles, some dating back to 1947. The current poles will be replaced with ta…
Build a 9.75 mile 3-phase overhead distribution electric line on private property along HWY 30 to connect two distribution feeders. This will consi…
DOYON LTD. Plans to overhaul the diesel generator in the City of Galena with the following updates: 1. Installation of the VFD, silencer, radiator …
Hydraulic testing of the Gordon Aquifer (GA) at CMP Pits will provide beneficial data to support ongoing monitoring activities at the groundwater u…
Bonneville Power Administration (BPA) proposes to replace in-kind wood pole structures and associated structural/electrical components (e.g., cross…
The U.S. Department of Energy (DOE) is proposing to provide federal funding to the University of Tennessee to engineer and validate a biochar and p…
CX-033553: Pick-Sloan Missouri Basin Program -Eastern Division (P-SMBP--ED): Rate Order No. WAPA-218
WAPA-UGP is proposing to use new formula-based methodology for UGP’s rate implementation and annual update procedures with changes related to the p…
Install fault indicators, recloser devices, and reconfigure/underground (where feasible) nine miles of older primary wire. These measures improve o…