Take a current section of primary electric service underground to provide better local electric service. The current overhead service runs close to…
Replace split and package units AT 751-1A. The units are old and need replacing.…
Repair the sanitary sewer line in Building 784-7A.…
CX-034607: Add N-Area Generator(s) for Use Greater Than 12 Months to the Insignificant Activity List
Surplus Plutonium Disposition (SPD) has been erecting quonset huts in N-Area. Units that will be used for a process for 12 months or more must be "…
Duke Energy Ohio proposes shovel-ready transmission and distribution improvements and energy storage initiatives for its service area. These projec…
Northern Lights plans to replace approximately 50 existing wooden utility poles with ductile iron poles. A crew will remove the wooden poles while …
Overhead to underground conversion of approximately125 pole locations. …
This review is supplemental documentation to the existing and approved PIP II Environmental Assessment (EA) ID No. DOE/EA-2072 and Finding of No Significant Impact (FONSI).
At 607-1F rectangle basin, we will install a temporary cover to prevent water from accumulating inside it. To install this cover, some conduit and …
Rev. 1 - Building changed from 291-F to 221-F. The receptacles for the sump pumps on the 221-F roof will be replaced with a new weatherproof type.…