The scope for this activity the relocation of Recycle Vessel Vent (RVV) No. 1 Fan Assembly and RVV No. 2 dampers in H-Canyon Building 292-H.…
Legacy chemical containers in 105-L will be sampled and then disposed of following characterization.…
Remove pressure relief valves associated with a legacy compressed gas system.…
Weapon Production Technology (WPT) group is replacing the legacy inert gas purification system from Vacuum Atmospheres Company (VAC) in Lab C-061 p…
The overall scope of this R and D activity is to carry out organic synthesis of organic ligands, ionic liquids, metal-organic frameworks, and organ…
Bonneville Power Administration (BPA) proposes to allow a private landowner to upgrade an existing driveway, install a 12-inch-diameter culvert und…
The proposed actions comprise maintenance support services frequently and routinely requested for operational support of DOE facilities and propert…
730-1B Installation of Wi-Fi in Conference Rm. 204.…
Install Junction Box in Transformer Room 4 to Support PA Speaker/Channel Moves.…
This Temporary Modification will install a Peterson Products Company Multi-Flex inflatable plug inside manhole P68 near the 234-H cooling towers.Re…