To provide Improvements to the Malden Substation grounding, drainage, fencing, and control building. The existing perimeter fence will be completel…
CX-034005: Washington DNR Bonneville Ross No. 1/N Bonneville-Troutdale No. 1 Access Road Use Request
BPA would allow the Washington Department of Natural Resources (DNR) to use approximately 0.8 mile of BPA's existing access road within BPA ROW on …
Construction of a converter station and an overhead high voltage direct current (HVDC) transmission line in the Nikiski area, a submarine HVCD cabl…
Wooden pole replacement (134)…
BUECI plans to upgrade existing aged switchgear with modern, better weatherized vacuum circuit breakers and protective relays. The new system will …
Bonneville Power Administration (BPA) proposes to fund the Washington Department of Fish and Wildlife (WDFW) for continued annual operations and ma…
Bonneville Power (BPA) proposes to allow the applicant, City of Forest Grove, to install two separate underground powerlines along the south end of…
The U.S. Department of Energy (DOE) is proposing to administer Congressionally Directed Spending to the California State University Maritime Academ…
Project's primary objective is site characterization including water sample collection, drilling an USDW well, aerial studies, soil gas sampling, a…
The U.S. Department of Energy's (DOE) National Renewable Energy Laboratory (NREL) is proposing to provide technical assistance to the Federal Geoth…