This project includes the installation of two Pano AI cameras and six IntelliRupter PulseClosers on existing distribution infrastructure, both of w…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), conducted emergency structure replacements on its existing Stegall-Gering No…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to replace existing Structure 3/4 and 4/8 on the Boysen-Pilot Butte…
The U.S. Department of Energy (DOE) is proposing to administer funding to CertainTeed, LLC (CT) to install solar collecting parabolic mirrors and a…
DOE's Office of Clean Energy Demonstrations (OCED) is proposing to provide funding to Alliant in support of the Columbia Energy Storage Project. Th…
Removal of old fire water drain line and installation of a new one.…
Installation of two tornado shelters inside N-Area. One will be West of 704-1N and the other will be South of 731-2N.…
731-1N Paint warehouse floor markings.…
Install a 14 feet x 14 feet concrete slab at 713-3N and a 17 feet x 17 feet concrete slab at 713-2N.…
766-H Room 1061/1066 Nurse Station modifications.…