50 Ohm Resistance Thermal Devices (RTD) shall be replaced with100 Ohm Platinum RTDs. Associated Recorder shall be reprogramed to accept the new 10…
Water Monitoring Equipment Deployment in F and E Area Basins…
The U.S. Department of Energy (DOE) is proposing to provide federal funding to Copeland LP to develop a modular, plug-and-play, load-flexible heat …
The project includes modeling, engineering design, and laboratory work for a novel chemical looping concept to reduce carbon dioxide emissions from…
EEA proposes to set up an advanced vegetation management software, acquire data, setup and configure the system, and perform drone inspections of t…
Ash sampling, ash characterization to determine rare earth content, lab-scale production to optimize CM recovery, engineering design of potential f…
Assembling a laboratory test platform for pipeline process simulation. Cybersecurity course development. Excavation training of students and indust…
This revision of the Idaho National Laboratory (INL) Cell Site 6 expansion at the Critical Infrastructure Test Range Complex (CITRC) includes an up…
There is one approx. 35 cu ft, non-flammable Nitrogen Compressed Gas (cylinder) that was part of a night vision purge kit. We plan to vent it.…
Isolate and remove 704-Z clean air handling units.…