Project mgmt, drilling, sample collection, field studies for example, well logging, computational simulations and modeling, community benefits, ris…
Replace Fire Alarm Panel / Components at 785-6A and 785-1A.…
The common copper service water header in 784-7A is being replaced with PVC piping. This activity is being performed to minimize the potential risk…
Deteriorated ACM (Asbestos Containing Material) window glazing will be removed and replaced at 760-11G.…
Subcontractor will provide roof repairs at 211-42H. The Subcontractor will not disturb the existing roof while performing these repairs on 211-42H.…
Remove/Reinstall 181 Drain Tank Outlet Valve and Replace Pump P-T181…
The flooring in 702-H will be replaced.…
BPA proposes to fund the Nez Perce Tribe (NPT) to survey and treat noxious weeds/invasive plants in the Lapwai Creek watershed to minimize their sp…
The GOPHURRS program seeks to simplify the construction of underground medium voltage (MV, 5 – 46 kilovolt) power distribution grids by adopting a …