Bonneville Power Administration (BPA) proposes to fund the Nez Perce Tribe (NPT) to outplant salmon carcasses in the Crooked River on federal land …
      New substation, Electric Line, and Pole Replacement…
      4.2 C is field work related to collection of seismic data. 4.2 D is processing of seismic data. 4.5 Baseline data collection- targeted water sample…
      The activities that are covered in this initial categorical exclusion NEPA determination are consistent with the activities under milestones 1.1 th…
      The U.S. Department of Energy (DOE) is proposing to provide funding to the City of Grand Junction to install a 116.13-kilowatt solar array to the r…
      Installation of a microgrid at the Carlson Power Plant and JBPU distro system.  Equipment such as battery storage, controls, relaying, electric veh…
      Replacement of old, aging overhead distribution infrastructure. Replacement of failing and old poles with a specific focus within the disadvantaged…
      DOE is proposing to provide funding in support of ARCH2 Phase 1 activities which include planning and design activities, information gathering and …
      The Proposed Activity is for E-DCF-H-09750 to add an extension to the ARM-8 detector in 264-2H Cask Receiving.…
      Removal of F-Area perimeter fence, associated gates, and all posts North of 707-F to vendor parking. F-Area perimeter fence located north of buildi…
       
        