The Steering South Texas Toward Solar Success would include installing a 8 kW roof top solar demonstration on the DreamBuild affordable, modular ho…
CX-270768: Abandoned Raw Water Pipe Removal and Bank Stabilization in Little Beaver Creek 451.1a-078
This activity will remove abandoned steel piping that previously transferred water from the X-605 Sanitary Water Control House and associated wellfield, and stabilize creek bank to reduce further erosion.
WAPA proposes to replace insulators along the ODA-TCY transmission line.…
WAPA proposes to replace insulators along a portion of the HUR-TRY transmission line. To aid in this process, one helicopter landing zone was selec…
WAPA proposes replacement of insulators along the CW-RSW line and intends to use the helicopter landing zone on private property approximately 500 …
Funding will support the project's research, development, and scaling the pilot production of a 3-D ceramic solid-state lithium-metal battery techn…
This Amended Determination follows the approval of additional funds and period of performance to test and validate the project team's state-of-the-…
OCED is proposing to provide funding to the Dakota Carbon Center East Project, LLC in support of Phase 1 of the Project Tundra CCS Commercial Demon…
Overhead Utility Line Conversions, Underground Conductor Replacements, Line and Pole Hardening, Substation Rebuild, and Overhead to Underground Res…
Modification, alteration, maintenance, paving and striping of the gravel overflow parking lot in SWPF.…