Bonneville Power Administration (BPA) proposes to fund the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to monitor water temperat…
Replace glovebox oxygen alarm panel annunciator in Control Room of Building 264-H.…
CX-030718: Replacement of Scanning Electron Microscope (SEM) in Inert Metallography Laboratory (IML)
The JEOL JSM-6460LV Scanning Electron Microscope (SEM), along with all peripheral attachments, are to be removed and replaced with a new SEM.…
With the evolving construction of the Surplus Plutonium Disposition (SPD) Project an existing Quonset hut (763-111N) will be removed, and a new fab…
Tornado shelters shall be installed in various places around F-Area to support the SRPPF project.…
Project management, Development of pre-FEED study of intermodal transport hub, Permitting and regulatory plan, Techno-economic assessment, Hazard i…
Planning characterization activities to include: office-based work such as data analysis, modeling, outreach, and permitting, and lab experiments. …
Geophysical work is conducted via conductivity/resistivity surveys and magnetic surveys. …
Pilot testing of carbon capture solvent in existing demonstration-scale amine plant and laboratory analysis of solvent samples.…
Bonneville Power Administration (BPA) proposes to fund the Kittitas County Conservation District (KCCD) of the Yakima Tributary Access and Habitat …