The existing underground feeder 2-2 (13.8Kv) failed at 151-1L and will be replaced. The PILC cable that has failed was the original cable 70 years …
      The Scope of Work details the extraction of asphalt core samples from multiple locations along Road 8 to support SIE (Site Infrastructure Engineeri…
      The work scope involves the extraction of three (3) different asphalt core samples, taken at random location along Road G. These samples will be us…
      The work scope involves the extraction of asphalt core samples from multiple locations in F-Area to support the widening of the roads to support ad…
      Installation of Wi-Fi in 723-A.…
      Relocation of IWW Outfall H-07 and install an access road south of building 772-H, near current H-07 Outfall location.…
      Rev. 4: A Dominion Energy subcontractor, Marshfield Forest Service, will be conducting herbicide applications to the 115-kV and 230-kV electricity …
      Bonneville Power Administration (BPA) proposes to fund the Yakama Nation to conduct steelhead spawning surveys, passive integrated transponder (PIT…
      Bonneville Power Administration (BPA) proposes to purchase property near North Bend, Oregon. BPA currently operates facilities in this area and the…
      Funding will support the project's small-scale research and development of a process to convert plastic waste, such as plastic bottles and bags, in…
       
        