Clearing and Maintenance at Outfalls K-06, N-14, N-15, G-21, F-10, and 188-K Ash Basin.…
Install Load Bank at TEF for 254-21 Diesel Generator.…
An abandoned piece of conduit will be removed and disposed of as LLW.…
105-L Security System Modifications.…
New temporary K Area parking lot to support SPD Construction.…
Venting or direct-shipment and disposal of specialty gas cylinders (nitrogen, carbon dioxide, compressed air) in A Area.…
SRNL will be evaluating how to effectively remove zirconium oxide/stainless steel solids (ZrSST) from an H Canyon dissolver using a test system in …
Evaluation of adsorbents, getters, and catalysts at various operating conditions and gas compositions.…
The DOE-LM is proposing to install carports and a patented Beam EV ARC solar-powered level 2 dual-port electric vehicle charging station (EVCS) in …
BPA proposes to allow a large generator interconnection request in Yakima County, Washington. Cypress Creek Renewables, LLC (Cypress Creek) would i…