Provide a network of grid-edge devices (for sub-metering and load control) at the customer/distribution level to provide flexible load management i…
Installation of 19 sets of electronic reclosers in existing distribution substations including communications equipment in the substation building…
The inside perimeter curb is leaking water inside Dome 153 and therefore doesn't meet Resource Conservation and Recovery Act (RCRA) requirements and the safety basis requirements for liquid impediments. The existing curb will be removed and a new concrete curb will be installed.
The Classified Islands project will modify existing buildings to create Vault Type Rooms (VTR).
The U.S. Department of Energy (DOE) Office of Energy Efficiency and Renewable Energy (EERE) Water Power Technologies Office (WPTO) is proposing to …
The U.S. Department of Energy (DOE) is proposing to administer Congressionally Directed Spending to the City of Stanta Clara for the design and ins…
Modifications and renovations to Building 707-C will be made so the structure may be used as the Backup Computer Facility (BCF).…
Process Control Module (PCM) Replacement Portfolio, listed on Tritium Process Control Integrated Project List (TPC IPL) and funded through Maintena…
Clearing and Maintenance at Outfalls K-06, N-14, N-15, G-21, F-10, and 188-K Ash Basin.…