Hydraulic testing of the Gordon Aquifer (GA) at CMP Pits will provide beneficial data to support ongoing monitoring activities at the groundwater u…
Bonneville Power Administration (BPA) proposes to replace in-kind wood pole structures and associated structural/electrical components (e.g., cross…
The U.S. Department of Energy (DOE) is proposing to provide federal funding to the University of Tennessee to engineer and validate a biochar and p…
CX-033553: Pick-Sloan Missouri Basin Program -Eastern Division (P-SMBP--ED): Rate Order No. WAPA-218
WAPA-UGP is proposing to use new formula-based methodology for UGP’s rate implementation and annual update procedures with changes related to the p…
Install fault indicators, recloser devices, and reconfigure/underground (where feasible) nine miles of older primary wire. These measures improve o…
The Klickitat PUD will upgrade approximately 8,500 feet of old, outdated single phase distribution line to three phase line. These upgrades include…
Conduct initial engineering studies to determine and prioritize which grid components to further invest in.…
Conduct initial engineering studies to determine and prioritize which grid components to further invest in.…
Conduct initial engineering studies to determine and prioritize which grid components to further invest in.…