Design/Fab/Characterization of Near Surface Embedded Cooling Channel w ODS Layer CX(s) Applied: A9, B3.6Date: 07/01/2015 Location(s): PennsylvaniaOffices(s): National Energy Technology Laboratory
Albany-Eugene No. 1 Nesting Platform Relocation CX(s) Applied: B4.6Date: 07/01/2015 Location(s): OregonOffices(s): Bonneville Power Administration
Install Blank on Line WEE-3222 after 242016F Overheads CX(s) Applied: B1.3Date: 06/30/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Installation of Sentinel Wells for the A-2 Air Stripper System CX(s) Applied: B3.1Date: 06/30/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Replacing HVAC systems in Six Facilities Across the Site CX(s) Applied: B1.3Date: 06/30/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Novel Desiccant Cycle for Flue Gas Water Recovery and Cool Storage CX(s) Applied: B3.6Date: 06/30/2015 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy
Test Reactor Area-715 Evaporation Pond Liner Replacement CX(s) Applied: B6.3Date: 06/30/2015 Location(s): IdahoOffices(s): Nuclear Energy
Central Facilities Area and Materials and Fuels Complex Live Fire Range Modifications CX(s) Applied: B1.2, B1.12, B1.31Date: 06/30/2015 Location(s): IdahoOffices(s): Nuclear Energy
Bell Substation HVAC Replacement CX(s) Applied: B1.3Date: 06/30/2015 Location(s): OregonOffices(s): Bonneville Power Administration
Puget Sound Energy Fiber Connection CX(s) Applied: B1.42Date: 06/30/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration