Zinc Bromide Removal CX(s) Applied: B1.28Date: 12/15/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 705-3C CX(s) Applied: B1.3Date: 12/15/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Small Molecule Associative Carbon Dioxide Thickeners for Improved Mobility Control CX(s) Applied: A1, B3.6Date: 12/17/2015 Location(s): PennsylvaniaOffices(s): National Energy Technology Laboratory
Replace Oil Water Separators at Bryan Mound Caverns 1, 2, 4 and 5 - GFE (BM-MM-1203A) CX(s) Applied: B1.3Date: 12/15/2015 Location(s): Multiple LocationsOffices(s): Strategic Petroleum Reserve Field Office
Replace Oil Water Separators at Bryan Mound Caverns 1, 2, 4 and 5 - Install (BM-MM-1203) CX(s) Applied: B1.3Date: 12/15/2015 Location(s): Multiple LocationsOffices(s): Strategic Petroleum Reserve Field Office
Simulated Pu Dissolution Using Microwave Technology CX(s) Applied: B3.6Date: 12/14/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Widen Roadway at South of LAW Vault for Large Equipment Movement CX(s) Applied: B1.3Date: 12/14/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 105-K CX(s) Applied: B1.3Date: 12/14/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
D-Area Trailer and Handy House Demolition and Removal CX(s) Applied: B1.23Date: 12/14/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Midwest Regional Carbon Sequestration Partnership - Phase Three (Task Three) - Dover 33 Characterization Well CX(s) Applied: B3.1, B3.7Date: 12/14/2015 Location(s): MichiganOffices(s): National Energy Technology Laboratory