C-Area Trailer Demolition and Removal CX(s) Applied: B1.23Date: 06/23/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Simulant Studies for Hanford Recycle Solutions CX(s) Applied: B3.6Date: 06/23/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Operation of a Shielded Bruker AVANCE 300 NMR system CX(s) Applied: B3.6Date: 06/23/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Capitol Peak Communication Site Back-up Generator Replacement CX(s) Applied: B1.3Date: 06/23/2015 Location(s): OregonOffices(s): Bonneville Power Administration
Frontier Observatory for Research in Geothermal Energy - Fallon, NV (Phase One) CX(s) Applied: A1, A9, A11Date: 06/23/2015 Location(s): New MexicoOffices(s): National Energy Technology Laboratory
Real-Time In-Situ CO2 Monitoring (RICO2M) Network for Sensitive Subsurface Areas in CCS CX(s) Applied: B3.1, B5.13Date: 06/23/2015 Location(s): CaliforniaOffices(s): National Energy Technology Laboratory
Advanced Analytical Methods for Air and Stray Gas Emissions and Produced Brine Characterization CX(s) Applied: B3.1Date: 06/23/2015 Location(s): TexasOffices(s): National Energy Technology Laboratory
Optimized Comfort Systems for Low Load Homes Award Number: DE-EE0007058 CX(s) Applied: A9, A11, B3.1 Building Technologies Office Date: 06/22/2015 Location(s): PA Office(s): Golden Field Office
Storm Shelter Control Project CX(s) Applied: B2.3Date: 06/22/2015 Location(s): ArkansasOffices(s): Southwestern Power Administration
Tenkiller Dam and Norfolk Substation Protective Relay and Control Switchboard Panel Replacements CX(s) Applied: B1.3Date: 06/22/2015 Location(s): ArkansasOffices(s): Southwestern Power Administration