Malin-Hilltop #1 Wood Pole Replacement CX(s) Applied: B1.25Date: 07/02/2015 Location(s): OregonOffices(s): Bonneville Power Administration
Chenoweth Substation Water and Sewer Connection CX(s) Applied: B1.3Date: 07/02/2015 Location(s): CaliforniaOffices(s): Bonneville Power Administration
Longview Osmose 2015 Corrosion Mitigation and Repair Project CX(s) Applied: B1.3Date: 07/02/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Dome Tap-Wellton Mohawk Ligurta - Replace Structure CX(s) Applied: B1.3Date: 07/01/2015 Location(s): ArizonaOffices(s): Western Area Power Administration-Desert Southwest Region
Milford Site for Frontier Observatory for Geothermal Energy (FORGE) CX(s) Applied: A1, A9, A11Date: 07/01/2015 Location(s): UtahOffices(s): National Energy Technology Laboratory
STATIC Radiative Cooling for Cold Storage CX(s) Applied: B3.6Date: 07/01/2015 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy
Low-Cost Heat Pump with Advanced Refrigerant/Absorbent Separation CX(s) Applied: B3.6Date: 07/01/2015 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy
Snake River Plain Field Laboratory for Enhanced Geothermal Systems Development CX(s) Applied: A1, A9, A11Date: 07/01/2015 Location(s): IdahoOffices(s): National Energy Technology Laboratory
Active Cooling Thermally Induced Vapor-Polymerization Effect (ACTIVE) CX(s) Applied: B3.6Date: 07/01/2015 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy
Effect of Mixture Concentration Inhomogeneity on Detonation Properties CX(s) Applied: B3.6Date: 07/01/2015 Location(s): PennsylvaniaOffices(s): National Energy Technology Laboratory