Construction of an Electrical Substation and the Transmission Line Feeds for the Uranium Processing Facility (UPF) at the Y-12 National Security Complex (Y-12) (NEPA #4201.16, rev. 1) CX(s) Applied: B1.24, B4.11, B4.12Date: 04/19/2015 Location(s): Tenn...
Robotic Personal Conditioning Device CX(s) Applied: B3.6Date: 04/17/2015 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy
Saltstone Facility Groundwater Investigation Plan CX(s) Applied: B3.1Date: 04/16/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Analytical Methods for Radiochemical Measurements CX(s) Applied: B3.6Date: 04/16/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 704-2H CX(s) Applied: B1.3Date: 04/16/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
773-51A & 773-52A Roof Replacement CX(s) Applied: B1.3Date: 04/16/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 225-7H CX(s) Applied: B1.3Date: 04/16/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 225-8H CX(s) Applied: B1.3Date: 04/16/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Integrated Approach to Fluoride High Temperature Reactor Technology and Licensing Challenges - Georgia Tech CX(s) Applied: B3.6Date: 04/16/2015 Location(s): IdahoOffices(s): Idaho Operations Office
NERC Alert Phase III Transmission Line Structure Replacement Project CX(s) Applied: B4.6Date: 04/16/2015 Location(s): OklahomaOffices(s): Southwestern Power Administration