Test Reactor Area-774 Substation Equipment Upgrades CX(s) Applied: B2.5Date: 04/27/2015 Location(s): IdahoOffices(s): Idaho Operations Office
An Inexpensive Metal-free Organic Redox Flow Battery for Grid-scale Storage CX(s) Applied: B3.6Date: 04/26/2015 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy
Initiative for Resiliency in Energy through Vehicles CX(s) Applied: A9, A11Date: 04/24/2015 Location(s): VirginiaOffices(s): National Energy Technology Laboratory
Alvey Substation 230-Kilovolt Reactor Replacement CX(s) Applied: B4.11Date: 04/24/2015 Location(s): OregonOffices(s): Bonneville Power Administration
Soil and Groundwater Sampling at CMP Pits Operable Unit (OU) CX(s) Applied: B3.1Date: 04/23/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
FY15 Snohomish District Danger Pole Replacement Project CX(s) Applied: B1.3Date: 04/23/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Alcoa Power Sales Contract Amendment CX(s) Applied: B4.11Date: 04/23/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Main Ring Service Buildings E2 and E3 Demolition CX(s) Applied: B1.16, B1.17, B1.23Date: 04/23/2015 Location(s): IllinoisOffices(s): Fermi Site Office
Site-Wide Categorical Exclusion: Routine Maintenance CX(s) Applied: B3.1Date: 04/23/2015 Location(s): IllinoisOffices(s): Fermi Site Office
Mead Substation Stage 15- Foundation Rebuilds and Transformer Connections CX(s) Applied: B4.6Date: 04/23/2015 Location(s): NevadaOffices(s): Western Area Power Administration-Desert Southwest Region