Irradiation of Polymer Films and Organic Dye Powders in B Area CX(s) Applied: B3.6Date: 01/27/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Replacing Carpet & Tile Associated with RPD Offices in KAC Personnel Wing CX(s) Applied: B1.3Date: 01/27/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 703-43A CX(s) Applied: B1.3Date: 01/27/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Make Repairs to the Roof of the H-Canyon (221-H) Truckwell Airlock CX(s) Applied: B1.3Date: 01/27/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Institute for Advanced Composites Manufacturing Innovation Award Number: DE-EE0006926 CX(s) Applied: A9, A11, B1.31, B3.6 Advanced Manufacturing Office Date: 01/26/2016 Location(s): TN Office(s): Golden Field Office
U.S. High Performance Research Reactor Fuel Development Post Irradiation Examination CX(s) Applied: B3.6Date: 01/26/2016 Location(s): IdahoOffices(s): Nuclear Energy
Institute for Advanced Composites Manufacturing Innovation Award Number: DE-EE0006926 CX(s) Applied: A9, A11, B1.31, B3.6 Advanced Manufacturing Office Date: 01/26/2016 Location(s): TN Office(s): Golden Field Office
Box Butte Snake Creek 115 Kilovolt Transmission Line Structures 67 107 Replacements Box Butte County CX(s) Applied: B1.3Date: 01/26/2016 Location(s): NebraskaOffices(s): Western Area Power Administration-Rocky Mountain Region
Reston Substation Telecommunication Upgrades CX(s) Applied: B1.7Date: 01/26/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Installation of New Ice Machine in Test Reactor Area (TRA)-628 CX(s) Applied: B1.31Date: 01/25/2016 Location(s): IdahoOffices(s): Nuclear Energy