Loading Line 6 Upgrades CX(s) Applied: B1.31Date: 02/04/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Replacement at 681-1G CX(s) Applied: B1.3Date: 02/04/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 701-1H CX(s) Applied: B1.3Date: 02/04/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
DOE Environmental Review for Long-Term Power Purchase (2018-2022) CX(s) Applied: B4.1Date: 02/03/2016 Location(s): Multiple LocationsOffices(s): Western Area Power Administration-Sierra Nevada Region
Development of High-Output, Low-Input Energy Beets CX(s) Applied: B3.6Date: 02/03/2016 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy
Snake Creek Alliance Section of the Box Butte Snake Creek 115 Kilovolt Transmission Line Structure 362 Replacement Box Butte County CX(s) Applied: B1.3Date: 02/03/2016 Location(s): NebraskaOffices(s): Western Area Power Administration-Rocky Mountain Re...
SynPLASTome 2.0: Synthetic Plastid Genome to Reprogram Chloroplast Function for the Production of Fuels and Chemicals CX(s) Applied: B3.6Date: 02/03/2016 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy
Blade Shipping Joint for Simple Assembly Award Number: DE-EE0007259 CX(s) Applied: A9, B3.6 Wind Power Date: 02/02/2016 Location(s): NY Office(s): Golden Field Office
Categorical Exclusion Determination