Reservoir Assessment Relocation to Building 233-H CX(s) Applied: B1.31Date: 10/22/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Addition of an Unloading Station at the DWPF Portable Nitric Acid Storage Tank (PNAST) CX(s) Applied: B1.15Date: 10/22/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Hydrilla Control at PAR Pond Boat Dock CX(s) Applied: B1.3Date: 10/22/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Installation of Lock-out/Tag-out (LO/TO) Equipment Storage Cabinets in Test Reactor Area (TRA)-670 CX(s) Applied: B1.31Date: 10/22/2015 Location(s): IdahoOffices(s): Nuclear Energy
Stationary Wide-Angle Concentrator PV System CX(s) Applied: B3.6, B5.15Date: 10/21/2015 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy
Solid Acid Fuel Cell Stack for Distributed Generation Applications CX(s) Applied: B3.6Date: 10/21/2015 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy
Vantage Substation-Control House, Fire Detection and Alarm Installs CX(s) Applied: B2.2Date: 10/21/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Communication Equipment Removals (#WC Projects) CX(s) Applied: B1.19Date: 10/21/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Coolidge Substation Communication Equipment Upgrades CX(s) Applied: B4.6Date: 10/20/2015 Location(s): ArizonaOffices(s): Western Area Power Administration-Desert Southwest Region