Construction and Operation of the Integrative Genomics Building at the Lawrence Berkeley National Laboratory LB-CX-15-03 CX(s) Applied: B1.15, B1.24, B1.33, B3.6, B3.12, B3.15Date: 04/21/2015Location(s): CaliforniaOffices(s): Berkeley Site Office
Access Road Easement Acquisition for Midway-Moxee and Midway-Grandview Transmission Lines CX(s) Applied: B1.24Date: 04/21/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
FY15 Wood Pole Replacement - Kalispell District CX(s) Applied: B1.3Date: 04/21/2015 Location(s): MontanaOffices(s): Bonneville Power Administration
FY15 Wood Pole Replacement - Wenatchee District CX(s) Applied: B1.3Date: 04/21/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
North Marion-Sullivan No. 1. 57-Kilovolt Line Reinforcement Funding CX(s) Applied: B1.3Date: 04/21/2015 Location(s): OregonOffices(s): Bonneville Power Administration
Midway-Canon West 230 Kilovolt Transmission Line Access Road Maintenance El Paso and Pueblo Counties, CO CX(s) Applied: B1.3Date: 04/21/2015 Location(s): ColoradoOffices(s): Western Area Power Administration-Rocky Mountain Region
H Tank Farm (HTF) Blend and Feed Tank Modification CX(s) Applied: B1.3Date: 04/20/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Silver Chloride Injection at the F Area HWMF Barrier Wall CX(s) Applied: B6.1Date: 04/20/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Titanates for Optimized Performance in Separations Science, Innovative Medical Applications and Photochemistry CX(s) Applied: B3.6Date: 04/20/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Re-route SMARTDITCH and Channel Storm Water and Low Level Wastewater Discharges CX(s) Applied: B1.26Date: 04/20/2015 Location(s): New YorkOffices(s): West Valley Demonstration Project