Operation of ELE Permeameter CX(s) Applied: B3.6Date: 04/22/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
B-4 and B-6 Repaint Exhaust Stacks CX(s) Applied: B1.3Date: 04/22/2015 Location(s): West VirginiaOffices(s): National Energy Technology Laboratory
Install Solar Thermal on Ground Next to SERF CX(s) Applied: B5.1Date: 04/22/2015 Location(s): MarylandOffices(s): National Energy Technology Laboratory
Access Road Improvements for Allston-Clatsop No. 1 to Structure 10/1 CX(s) Applied: B1.3Date: 04/22/2015 Location(s): OregonOffices(s): Bonneville Power Administration
Tonto Apache Solar - Phase II Award Number: DE-EE0006946 CX(s) Applied: A9, B5.16, B5.17 Tribal Energy Program Date: 04/22/15 Location(s): AZ Office(s): Golden Field Office
PV SOLAR POWER FOR THE SANTO DOMINGO TRIBE’S COMMUNITY WATER PUMP AND TREATMENT FACILITY Award Number: DE-EE0006954 CX(s) Applied: A9, B5.16 Tribal Energy Program Date: 04/22/15 Location(s): NM Office(s): Golden Field Office
Pala Fire Station Solar Project Award Number: DE-EE0006951 CX(s) Applied: A9, B5.16 Tribal Energy Program Date: 04/22/15 Location(s): CA Office(s): Golden Field Office
Replace High Voltage Primary Bushings for GHTX-14 at RWIS CX(s) Applied: B1.3Date: 04/22/2015 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office
Canon West-Midway 230 Kilovolt Transmission Line Road Maintenance Fremont County, CO CX(s) Applied: B1.3Date: 04/22/2015 Location(s): ColoradoOffices(s): Western Area Power Administration-Rocky Mountain Region
Subcontractor To Replace 702-L Telecommunication Roof CX(s) Applied: B1.3Date: 04/21/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office