Ross Complex Sally Port Entrance Relocation CX(s) Applied: B4.7Date: 06/25/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Integrated Plastic Substrates for OLED Lighting CX(s) Applied: A9, B3.6Date: 06/25/2015 Location(s): CaliforniaOffices(s): National Energy Technology Laboratory
Integrated Flue Gas Purification and Latent Heat Recovery for Pressurized Oxy-Co CX(s) Applied: B3.6Date: 06/25/2015 Location(s): MissouriOffices(s): National Energy Technology Laboratory
Frontier Observatory for Research in Geothermal Energy - Coso, CA (Phase One) CX(s) Applied: A1, A9, A11Date: 06/25/2015 Location(s): New MexicoOffices(s): National Energy Technology Laboratory
Final Rulemaking for Energy Conservation Standards for Certain Industrial Equipment RIN: 1904-AD23 CX(s) Applied: B5.1 EERE- Buildings Technology Program Date: 06/24/2015 Location(s): Nationwide Office(s): Golden Field Office
Line 3007 Structure Replacement Project for Flood Prone Areas CX(s) Applied: B4.6Date: 06/24/2015 Location(s): ArkansasOffices(s): Southwestern Power Administration
Advanced, Energy-Efficient Hybrid Membrane System for Industrial Water Reuse Award Number: DE-EE0005758 CX(s) Applied: A9, B3.11, B3.6 Advanced Manufacturing Office Date: 06/24/2015 Location(s): NC Office(s): Golden Field Office
Building America Partnership for Improved Residential Constructions Award Number: DE-EE0007056 CX(s) Applied: A9, B3.1, B3.6 Building Technologies Office Date: 06/24/2015 Location(s): FL Office(s): Golden Field Office
Aberdeen Substation (Grays Harbor PUD) Tree Clearing CX(s) Applied: B1.32Date: 06/24/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
St. Johns-St. Helens Transmission Line Access Road Improvements CX(s) Applied: B1.3Date: 06/24/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration