Subcontractor Will Provide Roof Repairs at 722-5A CX(s) Applied: B1.3Date: 09/10/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
D-Area Trailer and Handy House Demolition and Removal CX(s) Applied: B1.23Date: 09/10/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
702-L and 702-K Correct/Reseal Foundation Flashing on Telecom Facility CX(s) Applied: B1.3Date: 09/10/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Wireless Test Bed Long-Term Evolution Tier III Cell on Wheels Purchase, Installation, and Testing CX(s) Applied: B1.31Date: 09/09/2015 Location(s): IdahoOffices(s): Nuclear Energy
Purchase, Installation and Training for a Friction Test Machine and an Impact Test Machine CX(s) Applied: B1.31Date: 09/09/2015 Location(s): IdahoOffices(s): Nuclear Energy
Enabling 10 mol/kg Swing Capacity via Heat Integrated Sub-Ambient Pressure Swing CX(s) Applied: A9, B3.6Date: 09/09/2015 Location(s): GeorgiaOffices(s): National Energy Technology Laboratory
Modification to SOFC Multi-Cell Array CX(s) Applied: B3.6Date: 09/09/2015 Location(s): West VirginiaOffices(s): National Energy Technology Laboratory
Willow Creek Building South Office Area Modification CX(s) Applied: B2.1, B2.2Date: 09/08/2015 Location(s): IdahoOffices(s): Nuclear Energy
Idaho National Laboratory Engineering Demonstration Facility Safety Shower Installation CX(s) Applied: B2.3Date: 09/08/2015 Location(s): IdahoOffices(s): Nuclear Energy
Categorical Exclusion Determination