Snohomish-Beverly Park Number 3 Transmission Line Wood Pole Replacement CX(s) Applied: B1.3Date: 42524 Location(s): WashingtonOffices(s): Bonneville Power Administration
T-Mobile Boistfort Peak Telecommunication Collocation CX(s) Applied: B1.19Date: 42524 Location(s): WashingtonOffices(s): Bonneville Power Administration
Chehalis-Olympia Number 1 Transmission Line Priority Pole Replacements CX(s) Applied: B1.3Date: 42524 Location(s): WashingtonOffices(s): Bonneville Power Administration
Categorical Exclusion Determination
Building 35 Roof Replacement CX(s) Applied: B1.3, B2.1, B2.2Date: 42524 Location(s): OregonOffices(s): National Energy Technology Laboratory
Building 26 Roof Replacement CX(s) Applied: B1.3, B2.1, B2.2Date: 42524 Location(s): OregonOffices(s): National Energy Technology Laboratory
Microscopy and Spectroscopy Research and Development CX(s) Applied: B3.6Date: 42523 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Renovate Lab for Kinetic Phosphorescence Analysis (KPA) CX(s) Applied: B1.31Date: 42523 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Glass Formulation, Testing, and Characterization CX(s) Applied: B3.6Date: 42523 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Relocation of Cell Exhaust and Diversion Hand-Switches CX(s) Applied: B2.3Date: 06/02/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office