Pilot Test of Novel Electrochemical Membrane System for Carbon Dioxide Capture
Chemical Looping Reactor Project CX(s) Applied: B3.6Date: 09/17/2015 Location(s): West VirginiaOffices(s): National Energy Technology Laboratory
Subcontractor Will Provide Roof Repairs at 192-2K CX(s) Applied: B1.3Date: 09/17/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 108-2K CX(s) Applied: B1.3Date: 09/17/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Install 480V Welding Receptacle in 250-S (Glass Waste Storage Building
Relocate Fire Control Panel and Remove Neutron
Install Pedestrian Signal Lights at Crosswalks CX(s) Applied: B2.3Date: 09/17/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor to Repair Roof Leaks at 766-H CX(s) Applied: B1.3Date: 09/17/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Idaho National Laboratory Research Center E-85 Fuel Station Removal CX(s) Applied: B5.22Date: 09/16/2015 Location(s): IdahoOffices(s): Nuclear Energy
Materials and Fuels Complex (MFC)-774 Central Alarm Station Remodel CX(s) Applied: B2.1Date: 09/16/2015 Location(s): IdahoOffices(s): Nuclear Energy