INTEC - Macroencapsulation/Overpack Operations in CPP-659 and CPP-1617 CX(s) Applied: B6.5Date: 01/06/2016 Location(s): IdahoOffices(s): Nuclear Energy
MERC-1 Natural Gas Well Closure CX(s) Applied: B1.3, B5.2, B5.3, B5.12, B1.34Date: 01/06/2016 Location(s): West VirginiaOffices(s): National Energy Technology Laboratory
Siting, Construction, and Operation of Chemical Consolidation Facility (CCF) CX(s) Applied: B1.15Date: 01/05/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Testing for Hot Fuel Examination Facility Gas Sample Assay and Recharge Upgrade at Idaho National Laboratory Research Center CX(s) Applied: B2.4Date: 01/05/2016 Location(s): IdahoOffices(s): Nuclear Energy
Install Concrete Slab at Pendleton Fish Acclimation Facility CX(s) Applied: B2.5Date: 01/05/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Electronic Equipment, Heating, Ventilation and Air Conditioning, and Security System Replacement and Upgrades at Existing Buildings or Facilities - 2016 thru 2017 CX(s) Applied: B1.7, B2.5, B4.6Date: 01/05/2016 Location(s): Multiple LocationsOffices(s)...
Process Science Analytical Lab (PSAL) CX(s) Applied: B3.6Date: 01/05/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Irradiation of Polymer Films and Organic Dye Powders in A-Area CX(s) Applied: B3.6Date: 01/05/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
The Design and Development of a Composite Hydropower Turbine Runner Award Number: DE-EE0007248 CX(s) Applied: A9,B3.6 Wind and Water Program Date: 01/04/2016 Location(s): CO Office(s): Golden Field Office
MSA Annual Categorical Exclusion for Repair or Replacement of Pipelines CX(s) Applied: B5.4Date: 12/31/2015 Location(s): WashingtonOffices(s): River Protection-Richland Operations Office