Subcontractor Will Provide Roof Repairs at 704-C CX(s) Applied: B1.3Date: 07/07/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Idaho Falls-682 Magazine Storage Design and Installation Project CX(s) Applied: B1.15Date: 07/07/2015 Location(s): IdahoOffices(s): Nuclear Energy
Relocate Hydroburst System from 238-H to 234-7H CX(s) Applied: B1.31Date: 07/06/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
MOX Laydown Northeast of 705-A CX(s) Applied: B1.15Date: 07/06/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Novel Polymer Composite Heat Exchanger for Dry Cooling of Power Plants CX(s) Applied: B3.6Date: 07/06/2015 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy
Waste To Wisdom: Utilizing Forest Residues For The Production Of Bioenergy And Biobased Products Award Number: DE-EE0006297 CX(s) Applied: A9, B3.1 Bioenergy Technologies Office Date: 07/06/2015 Location(s): CA Office(s): Golden Field Office
Tandem Particle-Slurry Batch Reactors For Solar Water Splitting Award Number: DE-EE0006963 CX(s) Applied: A9, B3.6 Fuel Cell Technologies Office Date: 07/06/2015 Location(s): CA Office(s): Golden Field Office
Naval Reactors Facility (NRF) Storm Sewer West Main Replacement Project CX(s) Applied: B2.5Date: 07/06/2015 Location(s): None ProvidedOffices(s): Naval Nuclear Propulsion Program
Clean Bryan Mound Crude Oil Tank, BMT-4 CX(s) Applied: B1.3Date: 07/06/2015 Location(s): None ProvidedOffices(s): Strategic Petroleum Reserve Field Office
BH Anhydrite Pond Chlorides Wash - Pilot Test and Full Pond Chlorides Wash CX(s) Applied: B1.3Date: 07/06/2015 Location(s): None ProvidedOffices(s): Strategic Petroleum Reserve Field Office