Bonneville-Hood River Transmission Line Wood Pole Replacements CX(s) Applied: B1.3Date: 03/04/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Bothell-Sno-King No. 1 and No. 2 Transmission Line Upgrades CX(s) Applied: B4.13Date: 03/04/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Final Determination of Coverage for Portable Air Conditioners (1904-AD02) RIN 1904-AD02 CX(s) Applied: A6 EERE-Buildings Technology Program Date: 03/03/2016 Location(s): Nationwide Office(s): Golden Field Office
Electrochemical Ammonia Synthesis for Grid Scale Energy Storage CX(s) Applied: B3.6Date: 03/03/2016 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy
Chimney Hill Solar Project Interconnection with PEC and Interface with the SWPA Tupelo Switchyard CX(s) Applied: A9Date: 03/03/2016 Location(s): OklahomaOffices(s): Southwestern Power Administration
Weatherization Assistance Program Award Number: DE-EE0006142 CX(s) Applied: B5.16 Weatherization & Intergovernmental Programs Office Date: 03/03/2016 Location(s): CO Office(s): Golden Field Office
SiC enabled High-Frequency Medium Voltage Drive for High-Speed Motors Award Number: DE-EE0007252 CX(s) Applied: A9, B3.6 Advanced Manufacturing Offices Date: 03/03/2016 Location(s): NY Office(s): Golden Field Office
Waste Heat-to-Power Using Scroll Expander for Organic Rankine Bottoming Cycle Award Number: DE-EE0005767 CX(s) Applied: A9, B3.11 Advanced Manufacturing Offices Date: 03/03/2016 Location(s): MA Office(s): Golden Field Office
Current Energy Harnessing using Synergistic Kinematics of Schools of Fish-Shaped Bodies Award Number: DE-EE0006780 CX(s) Applied: A9, B5.25 Water Power Program Date: 03/03/2016 Location(s): MI Office(s): Golden Field Office
Split Micro-Hybrid Boosting Enabling Highly Diluted Combustion CX(s) Applied: B3.6Date: 03/03/2016 Location(s): MichiganOffices(s): Advanced Research Projects Agency-Energy