Two EM prime contractors recently teamed up to provide hands-on training at the Hanford Site to increase safety and prevent contamination in the event of an emergency response.
The first batch of approximately 200,000 gallons of tank waste has been treated by the Hanford Site’s Tank-Side Cesium Removal (TSCR) System and is staged in a double-shell tank for immobilization in glass.
View this video about how laboratory technicians at the Hanford Site’s Waste Treatment and Immobilization Plant have been building proficiency in using a system that will safely transfer samples of radioactive waste.
An innovative team of truck drivers, engineers, mechanics and others has revamped trucks to make them more functional while transporting samples to support the tank waste mission at the Hanford Site.
EM’s Office of River Protection awarded Waste Treatment and Immobilization Plant (WTP) contractor Bechtel National, Inc. (BNI) approximately $5.8 million, about 74% of the available fee for work performed during the 2021 calendar year.
Federal and contractor leadership serving on a panel at the 2022 Waste Management Symposia last week discussed the progress of liquid waste treatment facilities at three EM sites as they work to meet cleanup commitments.
The EM Office of River Protection (ORP) and tank operations contractor Washington River Protection Solutions (WRPS) recently began operating a new exhauster ventilation system installed in the SY Tank Farm at the Hanford Site.
EM Senior Advisor William “Ike” White got a firsthand look at recent cleanup progress at the Hanford Site during a visit last week.
As any sports fan can attest, achieving greatness takes more than just a team full of star players. Experienced coaches need to design the plays and guide them to success.
Energy Secretary Jennifer Granholm and EM Senior Advisor William “Ike” White toured the Savannah River Site on Feb. 17 and 18.