RSS

EM construction crews at the Hanford Site are laying it on the line — literally — to expand the treatment capacity of the site’s already robust groundwater cleanup program.

EM crews recently completed a virtual inspection of an underground tank that once stored liquid waste from spent fuel reprocessing operations at the West Valley Demonstration Project in the 1960s and ‘70s.

An employee with EM Hanford Site 222-S Laboratory contractor Navarro-ATL recently encountered a chemical that required removal from the site by the local explosive ordnance disposal (EOD) unit after the chemical was placed in a safe configuration.

EM team members are priming three support facilities at Oak Ridge National Laboratory (ORNL) for teardown in the near future.

Plans to replace diesel-generated steam with electrically generated steam at the Hanford Site’s Waste Treatment and Immobilization Plant (WTP) are getting a funding boost from a recent $5 million DOE Assisting Federal Facilities with Energy Conservation Technologies Program grant.
EM’s Office of River Protection awarded Hanford Site Waste Treatment and Immobilization Plant contractor Bechtel National Inc. (BNI) approximately $9.5 million, or about 92%, of the available fee for work performed on the High-Level Waste (HLW) Facility last year.

The U.S. Department of Energy (DOE) today issued a request for qualifications (RFQ) related to the Cleanup to Clean Energy initiative focused on generating clean energy on DOE-owned lands.

EM awarded the Hanford Integrated Tank Disposition Contract to Hanford Tank Waste Operations & Closure, LLC of Lynchburg, Virginia, for work to be performed at the Hanford Site in southeastern Washington state.

EM Los Alamos Field Office (EM-LA) crews collected more than 8,670 soil, sediment, surface water and groundwater samples in 2023.

In an integral step toward preparing for tank waste treatment on the Hanford Site, the newly renovated load-in station at the Effluent Treatment Facility (ETF) recently reopened for business.