Worker Safety & Health Documents

You are here

March 31, 2020
Enforcement Worker Safety Document
Enforcement Letter, Battelle Energy Alliance, LLC
Related to several electrical relay failures and fire response events at Idaho National Laboratory’s Advanced Test Reactor.
March 6, 2020
Enforcement Worker Safety Document
Enforcement Letter, Nuclear Waste Partnership, LLC
Related to a near miss involving a backhoe tip over event at the Waste Isolation Pilot Plant.
January 24, 2020
Enforcement Worker Safety Document
Enforcement Letter, Alliance for Sustainable Energy, LLC
Related to an electrical shock from an energized insulation retaining wire at the National Renewable Energy Laboratory.
August 15, 2019
Enforcement Worker Safety Document
Enforcement Letter, Marto Electric, LLC
Related to an electrical shock event and resulting fire at the Sandia National Laboratories.
August 15, 2019
Enforcement Worker Safety Document
Enforcement Letter, Applied Construction Technologies 2, LLC
Related to an electrical arc event and resulting fire at the Sandia National Laboratories.
August 15, 2019
Enforcement Worker Safety Document
Preliminary Notice of Violation, National Technology and Engineering Solutions of
Related to high voltage and electrical shock events at the Sandia National Laboratories.
January 3, 2019
Enforcement Worker Safety Document
Preliminary Notice of Violation, Los Alamos National Security, LLC
Related to employee exposure to low oxygen conditions at the Los Alamos National Laboratory
October 17, 2018
Enforcement Worker Safety Document
Enforcement Letter, Consolidated Nuclear Security, LLC
Related to toluene exposure at the Pantex Plant.
September 14, 2018
Enforcement Worker Safety Document
Final Notice of Violation, Bechtel National Inc.
Associated with a worker injury that occurred during preparation of a piping system for pressure testing at the Hanford Site.
April 23, 2018
Enforcement Worker Safety Document
Consent Order, UChicago Argonne, LLC
Related to UChicago Argonne’s implementation of DOE’s 10 C.F.R. Part 851 electrical safety program requirements at Argonne National Laboratory.
March 2, 2018
Enforcement Worker Safety Document
Consent Order, Nuclear Waste Partnership, LLC
Related to NWP’s implementation of safety requirements for power transmission and distributions systems at the Waste Isolation Pilot Plant.
November 8, 2017
Enforcement Worker Safety Document
Preliminary Notice of Violation, Savannah River Nuclear Solutions, LLC
Associated with retaliation by Savannah River Nuclear Solutions, LLC at the Savannah River Site.
August 21, 2017
Enforcement Worker Safety Document
Preliminary Notice of Violation, National Security Technologies, LLC
Associated with electrical safety program requirements at the Nevada National Security Site.
May 19, 2017
Enforcement Worker Safety Document
Consent Order, Consolidated Nuclear Security, LLC
Related to a worker injury that resulted from fall from a fixed ladder into a utility pit at the Y-12 National Security Complex.
April 24, 2017
Enforcement Worker Safety Document
Enforcement Letter, Los Alamos National Security, LLC
Related to work planning and control deficiencies at the Los Alamos National Laboratory.
November 25, 2016
Enforcement Worker Safety Document
Consent Order, Washington River Protection Solutions
Related to a subcontractor employee’s fall into an abandoned septic tank during excavation at DOE’s Hanford site.
November 22, 2016
Enforcement Worker Safety Document
Preliminary Notice of Violation, UChicago Argonne, LLC
Associated with machine guarding program requirements and a near amputation at Argonne National Laboratory.
July 14, 2016
Enforcement Worker Safety Document
Enforcement Letter, UT-Battelle, LLC
Related to worker exposures to ozone at the Oak Ridge National Laboratory.
July 13, 2016
Enforcement Worker Safety Document
Preliminary Notice of Violation, BWXT Conversion Services, LLC
Associated with the inadvertent release of potassium hydroxide that injured two workers at the Portsmouth DUF6 Conversion Plant.
July 1, 2016
Enforcement Worker Safety Document
Enforcement Letter, URS Energy and Construction, Inc.
Related to heat stress management during deactivation and decommissioning work at the Separations Process Research Unit.
June 15, 2016
Preliminary Notice of Violation, Los Alamos National Security, LLC
Associated with implementation of the electrical safety program and a series of hazardous energy control events at the Los Alamos National Laboratory.
May 9, 2016
Consent Order, Battelle Energy Alliance, LLC
Related to an arc flash event that occurred during preventive maintenance on a vacuum breaker at the Idaho National Laboratory.
February 23, 2016
Enforcement Letter, National Security Technologies, LLC
Related to a chemical waste drum fire at the National Nuclear Security Administration’s Nevada National Security Site.
February 19, 2016
Preliminary Notice of Violation, Nuclear Waste Partnership, LLC
Associated with an underground fire involving a salt haul truck and a radiological release at the Waste Isolation Pilot Plant.
December 9, 2015
Consent Order, Brookhaven Science Associates, LLC
Related to an electrical shock by a subcontractor while working at the 220-foot level of a meteorological tower at the Brookhaven National Laboratory.