
Associated with a worker injury that occurred during preparation of a piping system for pressure testing at the Hanford Site.

Related to UChicago Argonne’s implementation of DOE’s 10 C.F.R. Part 851 electrical safety program requirements at Argonne National Laboratory.

Related to NWP’s implementation of safety requirements for power transmission and distributions systems at the Waste Isolation Pilot Plant.

Associated with retaliation by Savannah River Nuclear Solutions, LLC at the Savannah River Site.

Associated with electrical safety program requirements at the Nevada National Security Site.

Worker Safety and Health Enforcement Consent Order issued to Consolidated Nuclear Security, LLC relating to an employee fall into a utility pit

Worker Safety and Health Enforcement Letter issued to Los Alamos National Security, LLC relating to work planning and control deficiencies

Worker Safety and Health Enforcement Consent Order issued to Washington River Protection Solutions relating to an employee fall into an abandoned septic tank.

Worker Safety and Health Enforcement Preliminary Notice of Violation issued to UChicago Argonne, LLC for violations of 10 C.F.R. Part 851 relating to the machine guarding program at the Argonne National Laboratory.

Related to worker exposures to ozone at the Oak Ridge National Laboratory.