2013 B17 Renovation CX(s) Applied: B1.4, B1.15, B1.31, B2.1 Date: 05/03/2013 Location(s): West Virginia Offices(s): National Energy Technology Laboratory
Modification to the Petrography Laboratory CX(s) Applied: B2.3, B3.6 Date: 05/03/2013 Location(s): West Virginia Offices(s): National Energy Technology Laboratory
Building 26 Air Handlers and In-Line Return Fans Replacement CX(s) Applied: B1.3, B1.22, B.1.31 Date: 04/25/2013 Location(s): West Virginia Offices(s): National Energy Technology Laboratory
B-4 Rooms 110, 111, and 112 Roof Top Heating, Ventilation, and Air Conditioning Unit Replacement CX(s) Applied: B1.4, B2.1, B2.2, B2.5 Date: 04/16/2013 Location(s): West Virginia Offices(s): National Energy Technology Laboratory
Construction of a Liquid Propane Autogas Refueling Network CX(s) Applied: B5.22 Date: 11/02/2012 Location(s): West Virginia Offices(s): National Energy Technology Laboratory
B28 Demolition National Energy Technology Laboratory Morgantown CX(s) Applied: B1.23 Date: 09/24/2012 Location(s): West Virginia Offices(s): National Energy Technology Laboratory
Remove Odor Control System Located at the Southeast Exterior Corner of National Energy Technology Laboratory Morgantown Building 17 CX(s) Applied: B1.23 Date: 09/24/2012 Location(s): West Virginia Offices(s): National Energy Technology Laboratory
Feasibility of a Coal-Biomass to Liquids Plant in Southern West Virginia CX(s) Applied: A9 Date: 09/19/2012 Location(s): West Virginia Offices(s): National Energy Technology Laboratory
Audio/Video Technology Refresh: PGH/MGN CX(s) Applied: B1.15, B1.23, B2.2 Date: 09/17/2012 Location(s): West Virginia, Pennsylvania Offices(s): National Energy Technology Laboratory
Morgantown Parking Garage Fire Alarm System CX(s) Applied: B1.3, B1.7, B1.15, B2.5 Date: 09/13/2012 Location(s): West Virginia Offices(s): National Energy Technology Laboratory