Building 6 Stack Replacement CX(s) Applied: B1.3Date: 41855 Location(s): West VirginiaOffices(s): National Energy Technology Laboratory
Project Hydrogen Distribution System CX(s) Applied: B3.6Date: 41852 Location(s): West VirginiaOffices(s): National Energy Technology Laboratory
A Geomechanical Model for Gas Shales Based on Integration of Stress CX(s) Applied: A9, A11, B3.1, B3.11Date: 41851 Location(s): West VirginiaOffices(s): National Energy Technology Laboratory
Potable Water and Fire Water Supply Line Replacement CX(s) Applied: B1.3, B2.5Date: 41849 Location(s): West VirginiaOffices(s): National Energy Technology Laboratory
Petrography/Water Resources Laboratory CX(s) Applied: A9, B3.6Date: 41849 Location(s): West VirginiaOffices(s): National Energy Technology Laboratory
Novel Nanostructure Tailored Highly Active and Stable Electro-Catalytic Architecture on SOFC Cathodes CX(s) Applied: B3.6Date: 41836 Location(s): West VirginiaOffices(s): National Energy Technology Laboratory
Materials Research Laboratory (MRL) - B25 205/206 CX(s) Applied: B3.6 Date: 07/09/2014 Location(s): West Virginia Offices(s): National Energy Technology Laboratory
B14 Renovation CX(s) Applied: B1.4, B1.15, B2.1 Date: 06/23/2014 Location(s): West Virginia Offices(s): National Energy Technology Laboratory
Arc Flash Hazard Mitigations - Morgantown CX(s) Applied: B1.15, B2.5 Date: 05/12/2014 Location(s): West Virginia Offices(s): National Energy Technology Laboratory
Non-Newtonian Multiphase Laboratory CX(s) Applied: B3.6 Date: 04/28/2014 Location(s): West Virginia Offices(s): National Energy Technology Laboratory