Building 2 Air Conditioning Unit 2 Replacement CX(s) Applied: B1.3, B1.16, B2.1, B2.2Date: 09/12/2016 Location(s): West VirginiaOffices(s): National Energy Technology Laboratory
Building 26 Cafeteria Renovation CX(s) Applied: B1.3Date: 09/07/2016 Location(s): West VirginiaOffices(s): National Energy Technology Laboratory
Building 26 Foundation Repair CX(s) Applied: B1.3Date: 08/18/2016 Location(s): West VirginiaOffices(s): National Energy Technology Laboratory
Develop Cost-Effective Biological Removal Tech for Se and NO3 from FGD Wastewate CX(s) Applied: A9, B3.6Date: 08/12/2016 Location(s): West VirginiaOffices(s): National Energy Technology Laboratory
Minimizing Chromium Evaporation from Balance-of-Plant (BOP) Components by Utilizing Adaptive Focused Acoustics CX(s) Applied: B3.6Date: 07/28/2016 Location(s): West VirginiaOffices(s): National Energy Technology Laboratory
B-26 Roof Replacement CX(s) Applied: B1.3Date: 42558 Location(s): West VirginiaOffices(s): National Energy Technology Laboratory
Morgantown Access Control Expansion CX(s) Applied: B2.2, B2.3Date: 05/04/2016 Location(s): West VirginiaOffices(s): National Energy Technology Laboratory
Low-Pressure Development Combustor CX(s) Applied: B3.6Date: 02/29/2016 Location(s): West VirginiaOffices(s): National Energy Technology Laboratory
Biogasification CX(s) Applied: B3.6Date: 01/12/2016 Location(s): West VirginiaOffices(s): National Energy Technology Laboratory
MERC-1 Natural Gas Well Closure CX(s) Applied: B1.3, B5.2, B5.3, B5.12, B1.34Date: 01/06/2016 Location(s): West VirginiaOffices(s): National Energy Technology Laboratory