Award Number: DE-EE0009040, CX(s) Applied: A9, A11, B5.1, B5.16, Federal Energy Management Program, Location(s): TX, Office(s): Golden Field Office
Installing a new lift station capable of tying together all existing site lift stations and delivering a minimum of 5,000 gallons per day (GPD) of sewage approximately 3 miles to the Veolia Sewage Treatment Plant as well as demolishing the existing Sewage Treatment Plant.
Award Number: DE-EE0009036, CX(s) Applied: A9, B1.18, B5.1, Federal Energy Management Program, Location(s): TX, Office(s): Golden Field Office
Remove one deteriorated protective chain-link fencing system and reinstall a replacement system using all new material and hardware.…
Work in connection with the dredging of the raw water intake channel at the Department of Energy’s federal crude oil reserve site located at Bryan Mound.
Award Number: DE-EE0009141, CX(s) Applied: A9, Advanced Manufacturing Office, Location(s): TX, Office(s): Golden Field Office
Award Number: DE-EE0008850, CX(s) Applied: A9, B1.31, B3.6, B5.15, B5.22, Fuel Cell Technologies Office, Location: TX, Office(s): Golden Field Office
On-site testing, inspection, and calibration of the electrical equipment at the main site.…
Demonstrate viscosifiers in binary complexes to achieve reversibly super-adjustable viscosities and implement in reservoir injection fluids.…
Funding will support the project team's small-scale research and development activities to further develop and demonstrate a Boron-10 enriched hexa…