Texas A and M University proposes to establish a highly coordinated experimental and computational effort to deepen the physical understanding and …
5G-TSN Architecture Capable of Providing Real-Time Situational Awareness…
Perform the work in connection with the installation of above and below ground raceways.
The Austin Chalk/Eagle Ford Laboratory…
This NEPA Amendment consists of the construction and operation of a new aboveground fire water storage tank and pump house.…
Design, develop, and test the isolation components for both the cemented casing (cased) and the open-hole applications.…
WUSTL will advance the integration of a Ti-Ce electrode-decoupled redox flow battery system with conventional fossil-fueled power plants through d…
The crude oil surge tank BHT-7 will be taken out-of-service to clean it and perform a complete internal and external API 653 inspection.
Perform an inspection of the BM 30-inch crude oil pipeline at the location(s) indicated by smart pig surveys.
This is for the addition of two new fire hydrants at Bryan Mound.