The overall objective of this project is to develop a 5G integrated distributed edge computing framework that facilitates plant operators to condu…
Building 201 - Demolish existing A/C foundations and bollards for units CU-3, CU-4, and CU-1. Building 202 - Demolish air handling system CCUC-19, a packaged air conditioning unit mounted on wood beams on grade. ...
Desktop-based study for data analysis and report writing.…
Provide funding to FAS Holdings Group to develop a coating process for the manufacture of perovskite/silicon tandem solar photovoltaic (PV) cells.…
Perform the work in connection with the Janitorial Services Contract at the SPR Site Big Hill.
The overarching goal of the proposed project is to develop a microwave-assisted technology for low-cost production of hydrogen from fossil fuels. …
The objective is to demonstrate feasibility of modular, coal-based building prototypes where building components are coal-derived with properties m…
Provide federal funding to the City of Austin-Austin Energy to provide field validation of emergent technology for energy efficiency and grid respo…
The U.S. Department of Energy (DOE) is proposing to provide funding to Texas Tech University (TTU) to develop a process for the production of aroma…
Award Number: DE-EE0008780, CX(s) Applied: A9, B3.6, Water Power Technologies Office, Location(s): TX, Office(s): Golden Field Office