The crude oil surge tank BHT-7 will be taken out-of-service to clean it and perform a complete internal and external API 653 inspection.
Perform an inspection of the BM 30-inch crude oil pipeline at the location(s) indicated by smart pig surveys.
This is for the addition of two new fire hydrants at Bryan Mound.
The University of Texas at El Paso (UTEP) proposes to acquire an Instron 8862 servo-electric testing system with intelligent furnace control capabl…
Provide federal funding to the University of Houston to develop novel methods to map and characterize subsurface fractures using 3D seismic data in…
Texas A and M University proposes to (1) upgrade one gas ion source to a Toroidal Volume Ion Source (TORVIS) source to increase the proton beam cur…
The University of Texas at San Antonio (UTSA) proposes to expand the existing fuel fabrication capability of its Extreme Environment Materials Labo…
Abilene Christian University (ACU) proposes to add Raman and gamma spectroscopies to its Nuclear Energy eXperimental Testing (NEXT) Lab’s series of…
The overall objective of this project is to develop a 5G integrated distributed edge computing framework that facilitates plant operators to condu…
Building 201 - Demolish existing A/C foundations and bollards for units CU-3, CU-4, and CU-1. Building 202 - Demolish air handling system CCUC-19, a packaged air conditioning unit mounted on wood beams on grade. ...