The Austin Chalk/Eagle Ford Laboratory…
This NEPA Amendment consists of the construction and operation of a new aboveground fire water storage tank and pump house.…
Design, develop, and test the isolation components for both the cemented casing (cased) and the open-hole applications.…
WUSTL will advance the integration of a Ti-Ce electrode-decoupled redox flow battery system with conventional fossil-fueled power plants through d…
The crude oil surge tank BHT-7 will be taken out-of-service to clean it and perform a complete internal and external API 653 inspection.
Perform an inspection of the BM 30-inch crude oil pipeline at the location(s) indicated by smart pig surveys.
This is for the addition of two new fire hydrants at Bryan Mound.
The University of Texas at El Paso (UTEP) proposes to acquire an Instron 8862 servo-electric testing system with intelligent furnace control capabl…
Provide federal funding to the University of Houston to develop novel methods to map and characterize subsurface fractures using 3D seismic data in…
Texas A and M University proposes to (1) upgrade one gas ion source to a Toroidal Volume Ion Source (TORVIS) source to increase the proton beam cur…