Demolish existing electrical interconnect and install a pre-fabricated enclosure, switchgear, switching station, and support equipment.…
Demolition of buildings 11-54 and 11-54a. Tasks would involve the cutting and capping of the utilities, abate any asbestos within the facility, dem…
Development of a joint seismic-pressure-petrophysics inversion of continuous active source seismic monitoring. The work includes bench-scale lab wo…
Modular and pre-fabricated construction systems for construction of two buildings.…
Pantex is proposing the design and construction of the Flexible Production Support Facility (FPSF).…
Conduct a Front-End Engineering Design (FEED) study for the retrofit of the San Juan Generating Station (SJGS) with post-combustion carbon capture.…
Award Number: DE-EE0009031, CX(s) Applied: A9, B3.6, Solar Energy Technologies Office, Location(s): TX, Office(s): Golden Field Office
Subcontractor shall provide all tools, materials , piping, fittings, services, equipment,transportation, facilities and personnel to perform rebuil…
The scope of work would include the demolition of Building 12-034 and the associated ramp (buildings 12-034SS, 12-R-034, and 12-019P). …