To perform the work in connection with providing temporary steel to provide stability during removing and replacing the existing roof panels and purlins and installing new structural steel.
The subcontractors shall provide all materials, tools, equipment, supplies, transportation, facilities, labor, supervision and services required to…
Services of contractor to furnish all materials and labor necessary to remediate mold at Big Hills’s Crude Oil Lab and Warehouse. The contractor sh…
SpotX seeks authorization to export domesticallyproduced liquefied natural gas (LNG) in a volume equivalent to 51.75 billion cubic fe...
SpotX seeks authorization to export domestically produced liquefied natural gas (LNG) in a volume equivalent to 51.75 billion cubic fe...
The objective of this effort is to assist the United States Department of Energy (DOE) Strategic Petroleum Reserve (SPR) with the preparation of a …
Specifically, Blue Water Fuels seeks authorization to export domestically produced liquefied natural gas (LNG) in a volume equivalent to 3.4 billio...
Multiple OSROs will be chosen to provide supplemental emergency response support to assure resource availability for SPR oil spill events.
Currently, the Pantex Plant has a large volume of surplus container inventories. The proposed action would consist of leasing an off-site storage …
The subcontractor shall provide all materials, tools, equipment, supplies, transportation, facilities, labor, supervision and services required to …