Perform Hydrant Flushing, Maintenance, Prove Curb Valves, and Flow Test in C-Area CX(s) Applied: B1.3Date: 04/13/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 264-H CX(s) Applied: B1.3Date: 04/13/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 705-H CX(s) Applied: B1.3Date: 04/13/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Repair of Roof Leaks at 704-H CX(s) Applied: B1.3Date: 41827 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Installation of New A-Area Fire Water Pumphouse CX(s) Applied: B1.15Date: 04/02/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Electrical Operations Staff to Perform Yard Maintenance in Electrical Substations CX(s) Applied: B1.3Date: 04/02/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Waste Treatment Plant (WTP) Design Verification Testing CX(s) Applied: B3.6Date: 03/31/2015Location(s): South CarolinaOffices(s): Savannah River Operations Office
105-K Failed Tension Rod Disposition CX(s) Applied: B2.5Date: 03/31/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Install Automatic Condensate Valve on 108-1K Compressed Air System Receiving Tanks CX(s) Applied: B2.5Date: 03/31/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 773-A; E-131, E-133 CX(s) Applied: B1.3Date: 03/31/2015Location(s): South CarolinaOffices(s): Savannah River Operations Office