BioAccumulation Using Surrogate Samplers (BASS) CX(s) Applied: B3.6Date: 05/08/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Install Concrete Block Bins for Additional Rock Storage at MOX Batch Plant CX(s) Applied: B1.15Date: 05/08/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Section E B-Block Cell Windows 14-16 Replacement CX(s) Applied: B2.1Date: 05/04/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Gas Chromatographic Analysis of Samples for VOC's - Labs 135, 123 and 118 of 735-11A CX(s) Applied: B3.6Date: 05/04/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Electrochemical Polishing for Passivation of Materials CX(s) Applied: B3.6Date: 05/04/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Repair Two Damaged Wells FCB002CR FCB002DR CX(s) Applied: B3.1Date: 04/30/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Design and Installation of Gas Cabinet for Gas Cylinder Storage in K Area CX(s) Applied: B2.3Date: 04/30/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Security Upgrades for 773-41A per U-MT-A-00016 CX(s) Applied: B1.15Date: 04/30/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Dismantle and Remove Abandoned 773-A D-Wing Roof HVAC Equipment CX(s) Applied: B1.3Date: 04/30/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 703-B, A-79 CX(s) Applied: B1.3Date: 04/29/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office