Remove Concrete Piers that Supported the Removed Steam Line CX(s) Applied: B1.23Date: 06/16/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Convert Leak Detection Boxes LDB-1A and LDB-2A at FDB-2 to modified LDB's CX(s) Applied: B1.3Date: 06/16/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Soil Vapor Extraction Well AF-8 Vented to Atmosphere CX(s) Applied: B6.9Date: 06/16/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
K-Area Complex (KAC) Perimeter Intrusion Detection Assessment System (PIDAS) Drainage Enhancement CX(s) Applied: B1.3Date: 06/15/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Drainage Issue Outside the K-Area Complex (KAC) Restricted Area Fence CX(s) Applied: B1.3Date: 06/15/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Radionuclide Release from Tank Waste Residual Solids CX(s) Applied: B3.6Date: 06/15/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Preparation and Examination of Transmission Electron Microscopy (TEM) Specimens CX(s) Applied: B3.6Date: 06/09/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Operation of ELE Permeameter CX(s) Applied: B3.6Date: 06/09/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Optimizing Use of Silver Chloride for In-situ Treatment of I-129 in Groundwater CX(s) Applied: B3.6Date: 06/09/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Drainage Improvements East of Engineered Trench 2 Along Existing E-Area Perimeter CX(s) Applied: B1.3Date: 06/09/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office