Subcontractor Will Provide Roof Repairs at 705-5H CX(s) Applied: B1.3Date: 05/19/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Install a New Roof on the Man-way Structure North of Sand Filter 294-H CX(s) Applied: B1.3Date: 05/19/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Categorical Exclusion Determination
Categorical Exclusion Determination
Hanford Double Shell Waste Tank Corrosion Studies CX(s) Applied: B3.6Date: 05/11/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
HRTL X-ray Analysis Laboratory CX(s) Applied: B3.6Date: 05/11/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Non-Rad and Rad Microtrac Particle Size Analyzers CX(s) Applied: B3.6Date: 05/11/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Destructive Evaluation of Pu Storage Can Bundles CX(s) Applied: B3.6Date: 05/08/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 716-4A CX(s) Applied: B1.3Date: 05/08/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 703-H CX(s) Applied: B1.3Date: 05/08/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office