CX-017497: Subcontractor to Repair Savannah River Site Railroad System

Categorical Exclusion Determination

Office of NEPA Policy and Compliance

November 15, 2017
Estimated Read Time   min

The subcontractor, Queen City Railroad Construction, shall replace 3,400 wooden line ties and 20 wooden switch ties from the railroad bed, identified by site transportation and engineering as part of the 2018 scope of work for repairs to the site railroad system.