Work in the 723-A High Pressure Laboratory CX(s) Applied: B3.6Date: 03/31/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Burial of 13.8-kV Overhead Line in Burial Ground CX(s) Applied: B4.6Date: 03/31/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Replace Section E B Block Cell Exhaust (CE) Fans CX(s) Applied: B1.3Date: 03/30/2015Location(s): South CarolinaOffices(s): Savannah River Operations Office
Establish Digital Density Meter Analytical Capability in 735-A, D-wing CX(s) Applied: B3.6Date: 03/30/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Install a Metal Awning at 703-1B Over Entrance to Telecom Facilities CX(s) Applied: B1.3Date: 03/25/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Install a Metal Awning at 702-1C Over Entrance to Telecom Facilities CX(s) Applied: B1.3Date: 03/25/2015Location(s): South CarolinaOffices(s): Savannah River Operations Office
Install a Metal Awning at 702-2A Over Entrance to Telecom Facilities CX(s) Applied: B1.3Date: 03/25/2015Location(s): South CarolinaOffices(s): Savannah River Operations Office
Roof repairs at 773-A, D-1122 CX(s) Applied: B1.3Date: 03/25/2015Location(s): South CarolinaOffices(s): Savannah River Operations Office
Provide a Rated Wall for HB-Line Stairwell #2, Storage Room and Fire Door CX(s) Applied: B2.5Date: 03/25/2015Location(s): South CarolinaOffices(s): Savannah River Operations Office
Tank 50 Quarterly Sample Characterization CX(s) Applied: B3.6Date: 03/24/2015Location(s): South CarolinaOffices(s): Savannah River Operations Office