Subcontractor Will Provide Roof Repairs at 704-L CX(s) Applied: B1.3Date: 08/12/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
New Heating, Ventilation, and Air-Conditioning System for L-Area Complex CX(s) Applied: B2.1Date: 08/12/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 713-1N CX(s) Applied: B1.3Date: 08/12/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 704-1N CX(s) Applied: B1.3Date: 08/12/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Remove Inductively Coupled Plasma Mass Spectrometer from B147/151 CX(s) Applied: B1.31Date: 08/12/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Roof Repairs at 773-A CX(s) Applied: B1.3Date: 08/12/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Speciation of Mercury in Sludge Solids CX(s) Applied: B3.6Date: 08/12/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 617-11G, 12G, 13G, 14G CX(s) Applied: B1.3Date: 08/05/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Vegetation Maintenance / Herbicide Application to River Water Distribution System Underground Water Lines CX(s) Applied: B1.3Date: 08/05/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Place L-Lake Pedestal Support Structure CX(s) Applied: B1.3Date: 08/05/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office