Install Vadose Zone Lysimeters Near Slit Trench 14 and MWMF CX(s) Applied: B3.1Date: 03/05/2015Location(s): South CarolinaOffices(s): Savannah River Operations Office
Corrosion Testing of Coupons in Aqueous Solutions CX(s) Applied: B3.6Date: 03/05/2015Location(s): South CarolinaOffices(s): Savannah River Operations Office
Electrochemistry Corrosion Testing CX(s) Applied: B3.6Date: 03/05/2015Location(s): South CarolinaOffices(s): Savannah River Operations Office
Corrosion Testing CX(s) Applied: B3.6Date: 03/05/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
285-H Instrument Air Compressor System Shed CX(s) Applied: B1.15Date: 02/26/2015Location(s): South CarolinaOffices(s): Savannah River Operations Office
Actinide Removal Process (ARP)/Modular Caustic Side Solvent Extraction Unit (MCU) Life Extension Support Testing CX(s) Applied: B3.6Date: 02/26/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at K Reactor (918 Fan Room) CX(s) Applied: B1.3Date: 02/26/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
LIBS, Laser Ablation, Glow Discharge Studies CX(s) Applied: B3.6Date: 02/26/2015Location(s): South CarolinaOffices(s): Savannah River Operations Office
Install Oil Separator on Condensing Unit (CDU 700) CX(s) Applied: B1.3Date: 02/24/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Alloy Screening for High Temperature thermally Decomposed NHO3 Exposure CX(s) Applied: B3.6Date: 02/24/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office